Arizona · ADUs & Guest Houses

Arizona ADUs & Guest Houses, room for family, guests, or income.

From garage conversions to detached casitas, one Bayside team designs, permits, and builds your accessory dwelling unit, with utilities, finishes, and a fixed price planned from day one.

  • $80k – $500k+Typical investment
  • 8–24 WeeksTypical construction
  • Fixed PriceItemized before demo
  • Licensed & InsuredROC #353387
Planning your ADU

What an Arizona ADU really takes.

Choose the type of space you have in mind to see a typical budget, what's included, and how long it takes from the first sketch to your first guest.

Typical investment
$80k–160k
Construction
8–12 weeks
Typically included
  • Existing garage converted to a studio or 1-bed
  • Insulated walls, ceiling & new windows
  • Kitchenette & full bathroom
  • Ductless mini-split cooling
  • New entry door & finishes
Your timeline

About 6 months, end to end

Design & engineering6 wks
Permits & HOA review6–10 wks
Construction8–12 wks
Final inspection1 wk

Converting a garage reuses the existing slab, walls, and roof, which makes it the fastest and most affordable way to add a living unit.

Typical investment
$160k–320k
Construction
12–16 weeks
Typically included
  • 400–800 sq ft attached living unit
  • Private entrance
  • Full kitchen & bathroom
  • Own HVAC zone or mini-split
  • Exterior matched to your home
Your timeline

About 8 months, end to end

Design & engineering8 wks
Permits & HOA review8–12 wks
Construction12–16 wks
Final inspection1 wk

Sharing a wall with the main house keeps utility runs short, so an attached ADU costs less than a detached one of the same size.

Typical investment
$250k–500k+
Construction
16–24 weeks
Typically included
  • 400–800 sq ft detached guest house
  • Full kitchen, bathroom & laundry
  • Separate utilities and entry
  • Foundation, framing & new roof
  • Finishes matched to your main home
Your timeline

About 10 months, end to end

Design & engineering10 wks
Permits & utility plans10–14 wks
Construction16–24 wks
Final inspection1 wk

An ADU is a small home of its own, with its own utilities. We confirm sewer, water, and electrical capacity before design is final.

Where the budget goes

Every dollar, accounted for.

A typical split for an Attached ADU. Your Bayside estimate is itemized the same way, so you can see what each choice costs before we start.

Built for the desert

Built for Arizona summers.

Summer heat and intense sun shape how an ADU should be built. These are the choices we recommend most.

Stucco matched to your home
$8–14 / sq ft

Texture and color blended to your existing walls so the addition reads as original.

Concrete tile roof
$9–15 / sq ft

The Arizona standard: long-lasting, fire-resistant, and easy to match to existing roofs.

Standing-seam metal roof
$12–20 / sq ft

Reflects heat and suits modern rooflines and detached ADUs.

Dual-pane low-E vinyl
$700–1,200 / window

Blocks most solar heat while letting light in. A strong value choice.

Fiberglass frames
$1,000–1,800 / window

Stays stable in extreme heat and won’t warp, fade, or chalk over time.

Multi-slide patio door
$8,000–20,000

Opens a suite or guest house fully to the backyard.

Extended central HVAC
$10,000–20,000

Works when your current system has spare capacity, confirmed with a load calculation.

Ductless mini-split
$5,000–10,000

Independent, efficient cooling, ideal for ADUs and rooms far from the main unit.

Spray-foam insulation
$2–4 / sq ft

Seals the roof and walls against summer heat and keeps cooling costs down.

Your number, fixed before we start.These are typical Arizona planning ranges, not a quote. Your free in-home consultation gives you a fixed, itemized estimate based on your lot, your plans, and your permit needs.

Plan My ADU →
How it works

From first sketch to first guest.

See our full process →
  1. 01
    Week 1

    Consultation & site review

    We walk your property, check setbacks and utilities, and talk through how you’ll use the new space.

  2. 02
    Weeks 2–10

    Design & engineering

    Floor plans, elevations, and structural engineering, then a fixed, itemized estimate.

  3. 03
    6–14 weeks

    Permits & HOA

    We submit plans to your city and HOA and handle every comment until they’re approved.

  4. 04
    8–24 weeks on site

    Construction

    Foundation to finishes with one project lead, scheduled inspections, and regular updates.

  5. 05
    Handover

    Final inspection

    We pass final inspection, walk every detail with you, and hand over the keys.

Client reviews

Trusted with the biggest projects in their homes.

5.0
★★★★★Based on 56 Google reviews
Read all reviews →
They handled everything from getting the permits to passing inspections, and all the coordination in between. The communication was always clear and consistent, which gave us a great sense of comfort.
Daniel HayimKitchen & Bathrooms
They were easy to work with and very communicative, and helped us with the permits, inspections, and finding the right materials. Our project was smooth and importantly on budget!
Serena RoviraKitchen Remodel
He gutted my bathroom, moved plumbing, repositioned the vanity and toilet, and added recess lights. Sam and his crew were meticulously clean, thorough, punctual, and attentive to our needs.
Mia LevyBathroom Remodel
I 100% recommend Bayside for any type of home remodeling. They used the best material and took care of every detail. We’ll be contacting them again when we’re ready!
Rob AdamsKitchen Remodel
01 / 04
ADU FAQ

ADU & guest house questions.

Straight answers on cost, timelines, permits, and what your lot allows for an Arizona ADU.

Have a question we didn’t cover?

Meet With Our Designer → or call (602) 345-1464
  • In many cases, yes. A 2024 Arizona law requires larger cities to allow accessory dwelling units on most single-family lots. Size limits, setbacks, and HOA rules still vary by city and neighborhood, so we confirm what your lot allows during the site review.

  • An Arizona ADU typically runs $80,000 to $160,000 for a garage conversion, $160,000 to $320,000 for an attached unit, and $250,000 to $500,000 or more for a detached guest house. Size, utility connections, and finish level are the biggest cost drivers. Bayside gives you a fixed, itemized estimate before construction begins.

  • Construction typically takes 8 to 12 weeks for a garage conversion, 12 to 16 weeks for an attached ADU, and 16 to 24 weeks for a detached unit. Including design and permits, plan on roughly 5 to 12 months from your first meeting to move-in.

  • Often, yes, but rules vary. Many Arizona cities allow long-term rental of an ADU, while short-term rental rules and HOA restrictions differ by city and neighborhood. We review your city’s current rules and your HOA documents with you during planning.

  • Yes, a garage conversion is often the fastest and most affordable option because it reuses the existing slab, walls, and roof. We add insulation, windows, plumbing, and cooling, and confirm parking and setback requirements with your city.

  • Not always. Many ADUs share the main home’s water, sewer, and electrical service, sometimes with a panel upgrade. Separate meters are possible and can be useful for rentals. We confirm capacity and options before design is final.

  • Yes. Every ADU requires a building permit, and HOA communities usually require exterior approval as well. Bayside prepares the drawings and manages city and HOA review for you.

  • Yes. Bayside Home Builders is licensed in Arizona (ROC #353387), bonded, and insured. You can verify our license directly on the AZ ROC website.

  • Yes. Bayside offers $0-down home improvement financing. Many homeowners also use a HELOC or construction loan for larger projects, and our itemized proposals give lenders what they need.

Keep exploring

More of what we design & build.

An ADU is often part of a bigger plan. One team can take on the whole picture.

Book Consultation