Adu in Paradise Valley, Arizona

Serving the Valley

ADU Builders in Paradise Valley, AZ: Add a Legal Dwelling to Your Property

Bayside Home Builders designs and builds detached ADUs and guest casitas in Paradise Valley, handling permits, engineering, and construction under one contract so you are not managing three separate companies.

Get a free estimate

Adu in Paradise Valley, Arizonaadu project · Paradise Valley
ROC 353387
Licensed, bonded, and insured, AZ ROC 353387
Family-owned design-build contractor
Family-owned design-build contractor
Serving Phoenix and communities across the Valley
Serving Phoenix and communities across the Valley

A Large Lot in Paradise Valley Is an Asset. Leaving It Unused Is a Choice.

Most Paradise Valley properties have the square footage to support a fully independent guest unit or casita. The lot is there. The zoning, on larger parcels, often allows it. The cost to build runs roughly 150 to 400 dollars per square foot depending on finish level, site conditions, and utility connections, which is a real number, not a low-ball estimate. What stops most homeowners is not the lot or the budget. It is not knowing exactly what the town will and will not approve before spending money on plans.

What you are living with

You have aging parents in a separate wing of the house with no real privacy for either household. You have adult kids who need a landing spot without moving back under your roof. You have a pool house that could be a rentable unit or a proper guest suite but sits empty most of the year. The lot supports it. The question is whether the plans, the permits, and the construction will actually get done right.

What you get instead

We start with a site visit and a straight answer about what Paradise Valley's rules allow on your specific parcel. No renderings before we know what the town will approve. No surprises at permit submission. If the project pencils out, we give you a fixed-scope proposal with real costs included, utility connections, site prep, and finishes, not a base price that grows after you sign.

Our Recent Work

Kitchen remodelArizona

Kitchen remodel

Enhancing comfort, style, with sophisticated, minimalist aesthetic.

Full home remodelArizona

Full home remodel

Stunning contemporary design featuring floating wood stairs with sleek black steel railings

Accessory Dwelling Units Built to Code, Built to Last

An ADU adds a fully independent living space to your property. We handle design, permits, and construction as a single team, so nothing falls through the cracks between a designer and a separate builder.

01

Site and Zoning Review

Before any design work starts, we review your lot size, setbacks, utility access, and local zoning rules to confirm what you can actually build. No surprises at permit submission.

02

Custom Architectural Plans

We produce permit-ready drawings tailored to your lot and goals, whether that is a detached garage conversion, a new stand-alone structure, or an attached addition with a private entrance.

03

Full Permit Management

We submit to the building department, respond to plan-check comments, and schedule all required inspections. You do not have to chase city offices or decode permit portals.

04

Complete Structural Build

Foundation, framing, roofing, windows, and exterior finish are all completed by our licensed crews. Work is inspected at each required stage so the structure meets code from the ground up.

05

Mechanical, Electrical, and Plumbing

We rough in and finish all MEP systems, including a dedicated electrical panel, water supply, sewer tie-in, and HVAC sized for the unit. All work is permitted and inspected separately from the main house.

06

Interior Finish and Final Walkthrough

Insulation, drywall, flooring, cabinetry, fixtures, and appliances are installed and finished to match the scope we agreed on. We walk the completed unit with you before closing out the permit.

Why Homeowners Choose Bayside for Their ADU

A lot of contractors say they build ADUs. Fewer have handled the full cycle from zoning review through final inspection as a single accountable team. Here is what actually sets us apart.

01

One License, One Contract, One Point of Contact

As a licensed design-build contractor, AZ ROC 353387, we own every phase. You are not coordinating between an architect, a general contractor, and a separate permit expediter. One contract covers design through construction, and one person answers your calls.

02

We Tell You What Will Not Work Before We Start

Setback conflicts, utility capacity limits, HOA restrictions, and deed conditions can kill an ADU project mid-build. We do a thorough feasibility check upfront so you know exactly what is buildable on your lot before any money changes hands.

03

Family-Owned, Not a Volume Production Shop

We are a family-owned contractor, not a franchise turning over projects as fast as possible. The same people who sell the job manage the build. If something comes up in the field, a decision-maker is reachable the same day.

04

Permit History With Local Building Departments

We have submitted and closed ADU permits with multiple jurisdictions across the Valley. We know common plan-check sticking points before they delay your project, and we write our drawings to address them from the start.

What our clients say

★★★★★

Today we finished my kitchen and bath remodel. I worked with Paul who was nothing short of excellent. Not only did he design the kitchen and bath but he cared enough to order and oversee everything down to the tiniest detail. He suggested patterns…

Rhonda Oesterle · Arizona
★★★★★

We had an amazing experience with a whole house remodel with Bayside. Yarden was there for us throughout the entire process through design, picking materials and the construction. I have to admit I was a little nervous because of friends that have…

Connie Howe · Arizona

How an ADU Project Works With Us

Four straightforward phases from first conversation to move-in ready. We set expectations at each stage so you know what is happening and what comes next.

1

Feasibility and Scope Meeting

We meet at your property, walk the lot, review setbacks and utility locations, and discuss what you want the unit to accomplish, rental income, family housing, or a home office. We leave with enough information to tell you what is buildable and give you a realistic budget range.

2

Design and Permit Submission

Our team produces the architectural and engineering drawings, coordinates with structural and MEP engineers as required, and submits a complete permit package to the building department. We track the application, respond to plan-check comments, and notify you when permits are approved.

3

Construction

Work begins with site prep and foundation and proceeds through framing, roofing, exterior finish, and all mechanical, electrical, and plumbing rough-ins. Our project manager schedules required inspections at each phase and keeps you updated on progress and timeline weekly.

4

Final Inspections and Handoff

Once interior finishes are complete, we schedule the final building inspection and any utility sign-offs. After the permit is closed, we do a full walkthrough with you, deliver all warranty documents, and make sure any punch-list items are resolved before we consider the job done.

ADUs in Paradise Valley: What You Need to Know Before You Build

Paradise Valley operates under its own municipal rules, separate from Phoenix and Scottsdale. The town was not affected by House Bill 2720, the state law that expanded ADU rights in larger Arizona cities. That means local zoning and lot requirements still govern what you can build here. We serve Paradise Valley homeowners navigating those rules, from permit prep through finished construction.

Permits & review

Paradise Valley is an incorporated town with its own planning and building department, not governed by Phoenix or Scottsdale permitting processes. HB 2720, which loosened ADU restrictions across Arizona's larger cities, does not apply here. Local review typically involves zoning compliance, setback verification, and lot coverage limits. On larger lots, which are common in Paradise Valley, the path to approval can be more straightforward, but the process still moves on the town's timeline. Budget extra lead time for review compared to Phoenix proper.

Housing stock

Paradise Valley is an estate-lot community. Many properties sit on an acre or more, which gives you real options for a detached ADU, a guest casita, or a full accessory unit with a private entrance. Larger lots reduce the setback and coverage conflicts that complicate ADU builds on smaller suburban parcels. That said, existing structures, pool placement, and mature landscaping all affect where a new unit can physically go. We walk every site before quoting.

Areas we serve

We serve Paradise Valley and the surrounding Valley communities. If you are near the Paradise Valley, Scottsdale, or Phoenix border, we can work with you regardless of which jurisdiction your parcel falls under. We know the permit offices, the inspectors, and the practical differences between building under Town of Paradise Valley rules versus the City of Scottsdale or Phoenix.

ScottsdalePhoenix (northeast)ArcadiaMcCormick Ranch

Common questions

How much does it cost to build an ADU in Paradise Valley, Arizona?

Expect $150 to $400 per square foot for construction, depending on finishes, site conditions, and whether you need a septic connection or utility extension. A modest 600 square foot casita typically lands in the $200,000 to $280,000 range all-in. Paradise Valley lots are large and the town has its own review process separate from Phoenix or Scottsdale, which can add time and occasional design requirements. Permit and development fees in Paradise Valley generally run $5,000 to $12,000 on top of construction costs. We give you a fixed-price contract before a single shovel hits the ground.

Does Paradise Valley allow ADUs under Arizona's HB 2720?

This is a real point of confusion. Arizona House Bill 2720 expanded ADU rights statewide, but it specifically exempts municipalities with populations under 75,000. Paradise Valley falls below that threshold, so HB 2720 does not override the town's own zoning rules. Paradise Valley governs ADUs under its own code, and the town has historically been conservative about additional dwelling units on residential lots. We review your specific parcel and zoning designation before we quote you anything, because not every lot qualifies.

What is the biggest drawback of building an ADU?

Upfront cost and timeline are the honest answers. A detached ADU is essentially building a small house, with its own foundation, framing, mechanical systems, and utility connections. In Paradise Valley, plan review alone can take several months. The return is real, whether that is rental income, housing a family member, or added resale value, but you need to go in knowing this is a six-figure investment with a multi-month construction window, not a quick backyard project.

Is it cheaper to add on to my existing house or build a detached ADU?

An addition to the main house is usually less expensive per square foot because you are sharing existing walls, roof, and sometimes mechanical systems. A detached ADU costs more because it needs its own foundation, roof, HVAC, electrical panel, and plumbing runs. That said, a detached unit gives you true separation, which matters if your goal is a rentable unit, an aging parent's private space, or a home office with genuine privacy. We build both and we will walk you through which option makes more sense for your property and your goals.

Can I rent out an ADU in Paradise Valley?

Paradise Valley restricts short-term rentals more aggressively than most Valley cities. Long-term rentals, meaning leases of 30 days or more, are generally permitted for legal ADUs, but short-term platforms like Airbnb are subject to the town's short-term rental rules and registration requirements. Verify current rental regulations with the Town of Paradise Valley directly before you factor short-term rental income into your return-on-investment math. We can build the unit. How you use it is something you confirm with the town.

How long does it take to build an ADU in Paradise Valley?

From the day you sign a contract to the day you hand someone a key, budget 10 to 16 months for a detached ADU in Paradise Valley. Design and engineering typically takes 6 to 10 weeks. Town plan review adds another 8 to 16 weeks depending on workload and whether revisions are requested. Construction on a 500 to 800 square foot detached unit runs 4 to 6 months once permits are in hand. Contractors who quote you six months total are not accounting for Paradise Valley's review process.

What does Bayside Home Builders handle, and what do I have to manage myself?

We handle design, structural engineering, permit submittals, town coordination, and all construction trades under one contract. You are not hiring an architect separately, then a permit expediter, then a GC. You have one point of contact and one fixed price. What you handle is decisions, approvals on finishes and layout, and any HOA submittals if your neighborhood requires them. Many Paradise Valley neighborhoods have architectural review committees that operate separately from the town, and we will flag that early if it applies to your property.

Planning your remodel?

Bayside gives free, itemized estimates with no pressure to sign.