Kitchen Remodeling in Redmond, Washington

Serving Washington

Kitchen Remodeling in Redmond, WA That Gets Done Right the First Time

Bayside Home Builders handles design, permits, and construction under one roof so Redmond homeowners get a finished kitchen without the coordination headaches.

Get a free estimate

Kitchen Remodeling in Redmond, Washingtonkitchen remodeling project · Redmond
Licensed
Licensed and bonded, WA L&I
Family-owned design-build contractor
Family-owned design-build contractor
Serving communities across Washington
Serving communities across Washington

That 1980s Redmond Kitchen Is Costing You Every Day You Keep It

Redmond's tech-era building boom left a lot of homes with kitchens that were functional for their time, closed off from the living area, short on counter space, and wired for appliances that bear no resemblance to what you actually cook with today. Those kitchens feel small, dark, and disconnected from the rest of the house.

What you are living with

You work around a layout that was never designed for how people actually use a kitchen. The peninsula blocks traffic flow. The single overhead light leaves half the counter in shadow. The dishwasher and refrigerator compete for the same swing space. Every time you cook a real meal you are reminded the room was not built for it.

What you get instead

A proper kitchen remodel for a Redmond home in this era typically involves opening a wall or repositioning the layout, upgrading electrical to handle modern appliance circuits, replacing cabinetry that has lost its finish or function, and bringing countertops and lighting into line with how the rest of the house looks now. Done right, it also adds real resale value in a market where buyers on the Eastside have seen enough nice kitchens to know the difference.

Our Recent Work

Kitchen remodelWashington

Kitchen remodel

Enhancing comfort, style, with sophisticated, minimalist aesthetic.

Full home remodelWashington

Full home remodel

Stunning contemporary design featuring floating wood stairs with sleek black steel railings

What a Kitchen Remodel With Us Actually Includes

A lot of contractors hand you a demo price and figure out the rest later. We scope the full project before we touch a wall, so you know what you are getting and what it costs.

01

Layout and Design Planning

We work with you on cabinet placement, workflow, and traffic patterns before anything is ordered. Changes on paper cost nothing. Changes after cabinets are delivered cost real money.

02

Cabinet Supply and Installation

We source semi-custom and full-custom cabinetry and handle delivery coordination, installation, and adjustment. Doors hang level and drawers slide true before we call it done.

03

Countertop Fabrication and Setting

We template after cabinets are set, not before. That means your quartz, granite, or butcher block fits the actual cabinet run, not a measurement taken from a rough floor plan.

04

Plumbing Rough-In and Finish

Sink relocation, dishwasher supply lines, garbage disposal wiring, and fixture installation are all handled in-house or through our licensed sub-contractor network. No hand-off surprises.

05

Electrical Updates

Most kitchen remodels require new circuits for appliances and updated outlet placement to meet current code. We identify what your panel can handle before the project starts, not during it.

06

Tile Backsplash and Finish Work

Backsplash tile, trim, and paint are scheduled as part of the project sequence, not as an afterthought. The kitchen is complete when we hand it back, not when you track down a separate tile guy.

Why Homeowners Choose Bayside for Kitchen Work

These are specific things that affect your project outcome. Not marketing language.

01

Design and Build Under One Contract

We handle design and construction ourselves. You are not coordinating between a designer who draws plans and a contractor who second-guesses them. One point of contact, one contract, one place to call when something needs to change.

02

Licensed and Bonded Through Washington L&I

We carry current Washington Labor and Industries licensing and bonding. That matters if something goes wrong during construction. It also means the permits we pull are issued to a contractor the state has vetted.

03

We Pull the Permits

Some contractors skip permits on kitchen work to move faster. We do not. Permitted work protects your home value and your homeowner's insurance coverage. If an unpermitted kitchen remodel shows up during a sale inspection, it becomes your problem to resolve.

04

Family-Owned, Not a Franchise

Bayside is family-owned. The people who give you a quote are the people responsible for delivering the project. There is no national office setting policies that affect your job. Decisions get made locally and quickly.

What our clients say

★★★★★

We hired Bayside for a full home remodel, and the results are absolutely breathtaking! Coral was our project manager and did an outstanding job coordinating the team and managing every aspect of the project. The new open-concept living space and…

Kashi Bhutta · Washington
★★★★★

Bayside transformed our entire house into something straight out of a magazine! Coral, our project manager, was an absolute gem, organized, communicative, and attentive to every detail. From the new flooring to the redesigned layout, everything was…

Amina Sheraz · Washington

How a Kitchen Remodel With Us Works

Four stages from first conversation to finished kitchen. No surprises, no scope creep without your approval.

1

Site Visit and Scope Review

We come to your home, look at the existing kitchen, and ask specific questions about what you want to change and why. We take measurements, note the existing plumbing and electrical layout, and identify anything that could affect cost before we quote. You get a real picture of the project, not a ballpark.

2

Design and Written Proposal

We put together a layout plan and a detailed written proposal that itemizes the work. You see what is included, what is excluded, and what decisions still need to be made on materials. Nothing is vague. You review it, ask questions, and we revise until the scope reflects what you actually want.

3

Permitting and Material Ordering

Once you sign, we pull the required permits and order cabinets and long-lead materials. We give you a project start date tied to realistic lead times, not one designed to lock you in before we know delivery schedules.

4

Construction and Walkthrough

We build in a defined sequence, demo through finish, with a site lead who is accountable for daily progress. When work is complete, we do a walkthrough with you before we close out the permit and collect final payment. Punch list items get resolved, not deferred.

What Kitchen Remodeling Costs

Redmond kitchens vary widely in cost depending on your home's existing layout, the finishes you choose, and how much structural work the space actually needs.

$55k-75k

Mid-range remodel

New cabinets, quality countertops, updated appliances, and tile.

$75k-95k

Full remodel

Custom cabinetry, premium surfaces, and layout adjustments.

$95k-110k+

High-end remodel

Structural changes, high-end appliances, and fully custom finishes.

Redmond permits go through the City of Redmond's building department, and review timelines can run several weeks for projects that involve moving walls or relocating plumbing and electrical. Many homes in Redmond's established neighborhoods, particularly those built in the 1980s and 1990s, have galvanized supply lines or undersized electrical panels that surface during demolition and add scope. Cabinet lead times of six to eight weeks typically set the construction schedule, so we lock in a fixed scope and order materials before we pull the permit.

Kitchen Remodeling in Redmond, WA

Redmond sits in the heart of the Eastside, where a lot of the housing stock dates from the 1970s through the 1990s, and kitchens from that era were built before open-concept layouts, serious cooking, and modern appliances were the norm. We serve Redmond homeowners who are ready to fix that.

Permits & review

Kitchen remodels in Redmond fall under City of Redmond building permits when structural walls move, electrical panels or circuits change, or plumbing relocates. A straightforward cabinet-and-countertop swap typically does not require a permit. Anything involving load-bearing walls, GFCI upgrades to current code, or moving a sink does. We handle permitting as part of the project, so you are not chasing paperwork yourself.

Housing stock

A large share of Redmond homes were built between the 1970s and early 2000s. That means galley or compartmentalized kitchens, older electrical service that may not support modern appliance loads, and cabinetry that has aged out of both function and style. Older homes also sometimes have surprises behind walls, plumbing that does not meet current code, or subfloor conditions that need addressing before new flooring goes down. We price for what we can see and we tell you upfront what we might find.

Areas we serve

We serve Redmond and the surrounding Eastside communities. If you are within a reasonable drive of downtown Redmond, call us and we will tell you directly whether your project is in our service area.

Downtown RedmondEducation HillOverlakeKirklandBellevue

Common questions

Is $10,000 enough to renovate a kitchen in Redmond?

For most Redmond homes, $10,000 covers cosmetic updates only. Think new cabinet doors and hardware, fresh paint, a basic countertop swap, and a new faucet. It does not cover moving plumbing or electrical, replacing cabinets, or adding square footage. If your layout works and the bones are solid, a surface refresh in that range is possible. If you need structural or systems work, budget at least $30,000 to $50,000 for a mid-range remodel.

Can you redo a kitchen for $30,000 in Redmond?

Yes, a $30,000 budget is realistic for a mid-range kitchen remodel in Redmond, assuming you are not moving walls or relocating plumbing. That typically gets you semi-custom cabinets, quartz countertops, a tile backsplash, new appliances in the mid-tier range, and updated lighting. Redmond labor and permit costs run higher than national averages, so that same project in a lower cost-of-living market might land at $20,000 to $25,000. We give you an itemized estimate before any work starts so you know exactly where the money goes.

What is the most expensive part of a kitchen remodel?

Cabinets are almost always the single largest line item, often 30 to 40 percent of the total project budget. Custom cabinetry from a local shop can run $1,000 or more per linear foot installed. After cabinets, labor and countertops are the next biggest costs. Where homeowners get surprised in Redmond is electrical and plumbing upgrades. Older homes in neighborhoods like Education Hill or Bear Creek may have panels and supply lines that need work before anything cosmetic begins. We flag those issues during the estimate, not mid-project.

What is the 30% rule in remodeling?

The 30% rule is a general guideline that says you should not spend more than 30 percent of your home's current market value on a single remodel. In Redmond, where median home values are high, that ceiling is generous, so the rule rarely limits a kitchen project here. What it is really meant to do is prevent over-improving for your neighborhood. If comparable homes on your street have basic kitchens and yours becomes a $150,000 showroom, you likely will not recover that cost at resale. We can talk through realistic return on investment for your specific Redmond neighborhood.

Do I need a permit for a kitchen remodel in Redmond?

It depends on the scope. Replacing countertops or painting cabinets requires no permit. Moving walls, adding or relocating electrical circuits, or changing plumbing drain locations all require permits from the City of Redmond. Bayside pulls all required permits and schedules inspections as part of the project. Skipping permits to save time is a problem at resale and can void homeowner's insurance coverage for related claims.

How long does a kitchen remodel take in Redmond?

A straightforward cabinet and countertop replacement with no layout changes typically runs 3 to 5 weeks once materials arrive. A full gut remodel with new layout, electrical, and plumbing work runs 8 to 14 weeks on average. The biggest variable right now is cabinet lead times. Semi-custom cabinets are running 6 to 10 weeks from order to delivery. We factor that into your project schedule upfront so you are not living without a kitchen longer than planned.

Why hire a local Redmond contractor instead of a large national remodeling company?

Local contractors know Redmond's permit process, the city's inspection timeline, and the subcontractors worth calling. We have worked in Redmond neighborhoods from Willows to Overlake and understand what inspectors here look for. Large national companies often use a rotating crew of subs with no ongoing relationship. At Bayside, the same team that gives you the estimate is the team on your job. You also have a local business with a local reputation on the line, which matters when a question comes up six months after the project closes.

Planning your remodel?

Bayside gives free, itemized estimates with no pressure to sign.