Adu in Cedar Park, Texas

Serving Central Texas

ADU Builders in Cedar Park, TX

Bayside Home Builders designs and builds accessory dwelling units in Cedar Park from permit to final inspection, so you get a legal, rentable, or livable space without managing a dozen subcontractors yourself.

Get a free estimate

Adu in Cedar Park, Texasadu project · Cedar Park
Insured
Insured and bonded
Over 500 projects completed
Over 500 projects completed
Serving Austin and Central Texas
Serving Austin and Central Texas

Cedar Park Lots Have the Space. Most Contractors Do Not Know What to Do With It.

Larger suburban lots in Cedar Park look like easy ADU candidates until you get into the details. HOA restrictions, Williamson County utility district requirements, and city impervious cover limits catch a lot of homeowners off guard after they have already paid a designer.

What you are living with

You wait on a permit, find out your drainage plan is incomplete, or discover the septic system on older lots cannot handle a second dwelling without an upgrade. Some contractors quote you a number, start work, and surface those costs later. Others never mention them at all.

What you get instead

We pull your plat and check your zoning, HOA status, and utility capacity before we quote. You get a number that reflects your actual lot and your actual project, not a best-case estimate built for a different property in a different city.

Our Recent Work

Kitchen remodelTexas

Kitchen remodel

Enhancing comfort, style, with sophisticated, minimalist aesthetic.

Full home remodelTexas

Full home remodel

Stunning contemporary design featuring floating wood stairs with sleek black steel railings

Accessory Dwelling Units Built to Code, Built to Last

An ADU adds livable square footage to your property without buying a new lot. Whether you need a rentable unit, a guest suite, or a place for family, we handle the full project from permit drawings to final walkthrough.

01

Permit-Ready Design and Drawings

We produce the architectural drawings your local building department requires, sized and formatted to meet current zoning and setback rules for your property. You do not have to coordinate a separate architect.

02

Foundation and Structural Work

Detached ADUs get a properly engineered foundation matched to your soil conditions. Garage conversions and attached units get any required structural reinforcement so the finished space meets code for habitable square footage.

03

Full Mechanical, Electrical, and Plumbing Rough-In

We rough in all systems, coordinate inspections at each required phase, and use licensed trade partners for electrical and plumbing so every system is signed off before walls close.

04

Insulation and Energy Compliance

ADUs must meet the same energy codes as a primary residence. We install insulation, windows, and HVAC equipment that pass inspection and keep utility bills reasonable for whoever lives in the space.

05

Interior Finishes and Kitchen or Kitchenette

Flooring, cabinetry, countertops, fixtures, and trim are all included in our scope. We work from a finish schedule you approve before construction starts so there are no surprises at the end.

06

Site Work and Utility Connections

We coordinate water, sewer, and electrical tie-ins to the existing property service, handle any required utility upgrades, and restore disturbed landscaping so the finished ADU looks intentional, not tacked on.

Why Homeowners Choose Bayside for Their ADU

ADUs involve zoning research, permit coordination, and trade scheduling that most remodelers are not set up to handle well. Here is what we actually bring to the project.

01

We Pull the Permit, Period

We do not hand you a permit application and wish you luck. Our team prepares the drawings, submits to the building department, responds to plan review comments, and tracks the approval through to issuance. You stay informed without having to manage the process yourself.

02

Design-Build Under One Roof

Design and construction are handled by the same company, so the drawings we produce are priced by the crew that builds them. There is no gap between what the designer planned and what the builder can actually execute or afford to include.

03

Over 500 Projects Completed, Insured and Bonded

We carry full general liability insurance and are bonded on every project. With more than 500 completed projects behind us, we have encountered and solved the structural surprises, utility conflicts, and zoning edge cases that come up on real properties.

04

Fixed Scope Before We Break Ground

We do not start construction on a vague allowance budget. Before any work begins, you have a signed contract with a defined scope, a finish schedule you reviewed, and a timeline that accounts for permit lead time. Change orders happen when the scope changes, not because we underquoted to win the job.

How an ADU Project Works with Bayside

Most homeowners have never built an ADU before. Here is the straight sequence from your first call to handing you the keys.

1

Step 1: Site and Zoning Review

We start by reviewing your property, lot dimensions, existing structures, and local zoning rules to confirm what you can build and where. This step identifies setback requirements, size limits, utility connection points, and any restrictions that affect your options before you spend anything on design.

2

Step 2: Design, Pricing, and Contract

We develop a floor plan and scope of work based on what your site allows and what you need the space to do. You review the drawings, the finish schedule, and the project cost before signing. Nothing moves to permit submittal until you have approved the full plan.

3

Step 3: Permitting and Pre-Construction

We submit your permit package, respond to any plan review comments, and schedule trade partners once approval is in hand. Permit timelines vary by jurisdiction, and we set your expectations at the start based on current local lead times so the wait is not a surprise.

4

Step 4: Construction, Inspections, and Closeout

We build to the approved plans, schedule each required inspection, and do not close up walls until the rough-in phases are signed off. At completion, we walk the project with you, address any punch-list items, and hand you the final certificate of occupancy so the unit is legally habitable.

ADU Construction in Cedar Park, Texas

Cedar Park sits just northwest of Austin in Williamson County. Lot sizes here tend to run larger than inside Austin city limits, which often means more room to place a detached ADU without crowding your existing structure. We serve Cedar Park homeowners looking to add a guest suite, rental unit, or multigenerational living space on their property.

Permits & review

Cedar Park operates under its own municipal code, separate from Austin's Land Development Code. Accessory structures and dwelling units go through the City of Cedar Park building and development review process. Setback requirements, maximum square footage, and whether a unit can be rented long-term or short-term are all governed locally. Before design starts, we pull your plat, confirm your zoning district, and check utility tap capacity so there are no surprises mid-project.

Housing stock

Most Cedar Park subdivisions were built from the 1990s onward, with single-story and two-story homes on quarter-acre to half-acre lots. That stock is well suited to detached ADUs in the 400 to 1,000 square foot range. Completed local projects show units ranging from compact 432-square-foot studios up to two-bedroom, 950-square-foot structures with separate laundry and a deck. Your lot coverage limits and existing impervious surface will shape what size is actually buildable.

Areas we serve

We serve Cedar Park and the surrounding corridor along US-183 and 1431, including Leander, Round Rock, Pflugerville, and Georgetown. If you are in Williamson County or northern Travis County, we can take your project from permit application through final inspection.

LeanderRound RockPflugervilleGeorgetown

Common questions

How much does it cost to build an ADU in Cedar Park, TX?

For a detached ADU in Cedar Park, most homeowners should budget $150,000 to $280,000 depending on size, finish level, and site conditions. A basic 500 to 600 square foot unit with standard finishes sits at the lower end. A 900 to 1,000 square foot two-bedroom unit with upgraded appliances, a deck, and central HVAC pushes toward the top. Those numbers include design, permitting, foundation, utility hookups, and construction. What they do not include is land, because you already own it. Get skeptical of quotes that leave out site work, permit fees, or utility connections. Those line items are real costs that add up fast in Central Texas.

What are Cedar Park's rules for building an ADU?

Cedar Park has its own development code separate from Austin. Generally, detached ADUs are allowed on single-family lots, but setbacks, maximum square footage, lot coverage limits, and owner-occupancy requirements can all affect what you can actually build. The city has been updating its ADU ordinance in recent years, so the rules today may differ from what a neighbor built under two years ago. Before you commit to a floor plan or a budget, we pull your specific parcel's zoning and confirm what is currently allowed. That step is free when you work with us and it prevents expensive surprises later.

What are the disadvantages of building an ADU?

Honest answer: there are a few worth knowing before you start. First, the upfront cost is real. An ADU is not a weekend project, and financing one requires planning. Second, permitting in Cedar Park takes time, often two to four months depending on plan review workload, and that timeline is outside anyone's control. Third, if you plan to rent the unit, you become a landlord, which carries its own responsibilities. Fourth, a poorly designed ADU that does not fit your lot or your neighborhood can create drainage, parking, or privacy issues. None of these are reasons not to build one, but they are reasons to go in with a clear plan and realistic expectations.

What is the cheapest way to build an ADU in Cedar Park?

The lowest-cost path is usually a garage conversion or an attached addition, because you are reusing an existing structure or sharing a wall and foundation with your main house. A detached garage converted to living space can come in at $80,000 to $140,000 depending on condition and finishes. If you are building from scratch, keeping the footprint under 600 square feet, choosing a simple rectangular shape, and avoiding a full second floor cuts cost meaningfully. Prefab or modular ADUs are another option some homeowners consider, but you still pay for site prep, utility connections, and Cedar Park permits, so the savings are often smaller than advertised. The cheapest ADU is still a significant investment.

What are good floor plan options for a 1,000 square foot ADU?

At 1,000 square feet you have real flexibility. The most functional layouts we build in this range include a two-bedroom, one-bath plan with an open kitchen and living area, a one-bedroom plan with a dedicated home office and larger living space, and a two-bedroom, one and a half bath plan that works well for longer-term tenants or multigenerational family use. In Cedar Park's climate, covered outdoor space matters, so we usually build in a small covered porch or deck at that size. The right layout depends on who will use the space, whether that is a renter, an aging parent, or an adult child, and we design around that answer rather than a generic template.

How long does it take to build an ADU in Cedar Park?

From the first design meeting to a certificate of occupancy, plan on nine to fourteen months for a detached ADU. That breaks down roughly as one to two months for design and drawings, two to four months for city plan review and permitting, and four to six months for construction. Complexity, finish selections, and permit review times all affect where you land in that range. If you are hoping to have a unit ready to rent by a specific date, work backward from that target and start the process earlier than feels necessary. The biggest delays we see are homeowners who start the permit process six months after they meant to.

Do I need a separate meter or utility connections for a Cedar Park ADU?

Most detached ADUs in Cedar Park require their own electrical service panel and can be served from your existing meter or set up with a separate meter depending on how you plan to use and bill the unit. Water and sewer typically tie into your existing service lines, though the city may require an upgraded meter or additional tap fees depending on your lot and the size of the ADU. These utility connection costs are real and often underestimated. We include a utility coordination review in our pre-construction process so you know what Cedar Park will require before we break ground.

Planning your remodel?

Bayside gives free, itemized estimates with no pressure to sign.